• Essar Oil UK to build carbon capture facility

    Essar Oil UK Limited has announced its plan to build a 360 million-pound major new carbon capture plant at its Stanlow refinery in line with its ambition to become a leading low-carbon refinery by 2030.

    Essar is investing over 1 billion pounds into a range of energy efficiency, fuel-switching, and carbon capture initiatives, designed to decarbonise its production processes significantly by 2030 and put Essar at the forefront of the UK’s shift to low-carbon energy.

    Essar’s energy transition strategy is based on five principles: running the core Stanlow refining processes as efficiently and safely as possible; decarbonising Stanlow’s operations; building a hydrogen future through the launch of Vertex Hydrogen (“Vertex”) and as a key part of the HyNet consortium; developing green fuels (including Sustainable Aviation Fuels); and establishing the UK’s largest biofuels storage facility through Stanlow Terminals Limited.

    Essar will achieve its decarbonisation targets through a combination of incremental (energy efficiency and operating improvements) and transformational projects, including the 360 million-pound carbon capture plant announced, but also as a result of the significant investments, Essar is making into hydrogen and biofuels.

    Kent plc has been awarded a pre-FEED engineering contract to develop the facility that will take the CO2 emitted from one of Europe’s largest full-Residue Fluidised Catalytic Cracking units, located at the Stanlow refinery.

    Share This
    Facebooktwitterlinkedinyoutube